IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,299

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0211 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,764 $2,451 Not Implemented
DL0211 # 11 Y:2022 11 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,347 $16,607 Implemented
AS0529 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,450,229 $9,600 Implemented
AS0529 # 02 Y:2022 02 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,386,000 $40,297 Implemented
AS0529 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,960 $18,000 Not Implemented
AS0529 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $27,045 $300,000 Implemented
AS0529 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $6,134 $40,000 Not Implemented
AS0529 # 06 Y:2022 06 2022 Install Anaerobic Digester $232,359 $1,128,000 Implemented
OK1078 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $31,608 $540,200 Not Implemented
OK1078 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $659 Not Implemented
OK1078 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,426 $629 Not Implemented
OK1078 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,266 $300 Not Implemented
OK1078 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $325 $0 Not Implemented
MZ0328 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,088 $235,000 Not Implemented
MZ0328 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,047 $7,500 Not Implemented
MZ0328 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,438 $2,450 Not Implemented
MZ0328 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $302 $120 Not Implemented
OK1072 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $0 Implemented
OK1072 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,749 $0 Not Implemented
OK1072 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $439 $2,000 Not Implemented
OK1072 # 04 Y:2022 04 2022 INSTALL SUB-METERING EQUIPMENT $173,223 $1,272 Not Implemented
OK1072 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $265,528 $1,357,737 Not Implemented
AM0847 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $55,740 $5,500 Implemented
AM0847 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,000 Implemented
AM0847 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $1,420 $2,240 Implemented