IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0150 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,054 $2,900 Not Implemented
IC0150 # 03 Y:2008 03 2008 TURN OFF STEAM TRACING DURING MILD WEATHER $229 $229 Not Implemented
IC0150 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,630 $0 Not Implemented
IC0150 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,921 $6,440 Not Implemented
IC0150 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $21,400 $8,021 Not Implemented
IC0150 # 07 Y:2008 07 2008 REPAIR OR REPLACE STEAM TRAPS $71,867 $2,470 Not Implemented
IC0150 # 08 Y:2008 08 2008 USE SOLAR HEAT TO HEAT WATER $468 $4,411 Not Implemented
IC0150 # 09 Y:2008 09 2008 REPAIR AND ELIMINATE STEAM LEAKS $8,494 $3,000 Not Implemented
IC0150 # 10 Y:2008 10 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $246,428 $26,100 Not Implemented
IC0150 # 01 Y:2008 01 2008 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $391,205 $3,038,750 Not Implemented
WI0521 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,386 $11,000 Not Implemented
WI0521 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $0 Not Implemented
WI0521 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,035 $500 Not Implemented
WI0521 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $3,200 Not Implemented
WI0521 # 03 Y:2006 03 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,900 $18,000 Not Implemented
WI0521 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,408 $13,600 Not Implemented
WI0521 # 01 Y:2006 01 2006 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $222,888 $230,600 Not Implemented
WI0332 # 05 Y:1998 05 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $535 $0 Not Implemented
WI0332 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $226 Not Implemented
WI0332 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,198 $200 Not Implemented
WI0332 # 03 Y:1998 03 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,188 $14,000 Not Implemented
WI0332 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $16,089 $500 Implemented
WI0332 # 01 Y:1998 01 1998 $72,000 $150,000 Implemented
WI0052 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $1,500 Implemented
WI0052 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $119 $0 Not Implemented