Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0601 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $137 | $530 | Implemented |
WV0601 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $514 | $1,425 | Implemented |
WV0601 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,170 | Implemented |
WV0601 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,303 | $10,560 | Implemented |
WV0601 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,355 | $1,691 | Implemented |
WV0601 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $13,900 | Implemented |
WV0601 # 04 Y:2020 | 04 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $4,392 | $6,660 | Implemented |
WV0601 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,944 | $3,000 | Implemented |
WV0601 # 02 Y:2020 | 02 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $15,085 | $15,000 | Implemented |
WV0601 # 01 Y:2020 | 01 | 2020 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,050 | $90,000 | Implemented |
WV0193 # 12 Y:2000 | 12 | 2000 | METER WASTE WATER | $79,068 | $1,000 | Implemented |
WV0193 # 13 Y:2000 | 13 | 2000 | CLEAR AND RENT EXISTING SPACE | $3,100 | $2,000 | Implemented |
WV0193 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $143 | $164 | Not Implemented |
WV0193 # 11 Y:2000 | 11 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $540 | $80 | Implemented |
WV0193 # 10 Y:2000 | 10 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,928 | $200 | Implemented |
WV0193 # 09 Y:2000 | 09 | 2000 | COVER OPEN TANKS | $500 | $2,500 | Not Implemented |
WV0193 # 08 Y:2000 | 08 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $161 | $500 | Not Implemented |
WV0193 # 07 Y:2000 | 07 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,631 | $3,680 | Not Implemented |
WV0193 # 06 Y:2000 | 06 | 2000 | BURN A LESS EXPENSIVE GRADE OF FUEL | $12,868 | $14,400 | Not Implemented |
WV0193 # 05 Y:2000 | 05 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $373 | $190 | Implemented |
WV0193 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $493 | $667 | Implemented |
WV0193 # 03 Y:2000 | 03 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,378 | $3,564 | Not Implemented |
WV0193 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $402 | $160 | Not Implemented |