IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0034 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $3,790 $2,000 Not Implemented
UU0034 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,560 $0 Not Implemented
UU0034 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,759 $800 Not Implemented
UU0034 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,938 $1,000 Not Implemented
UU0034 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,627 $3,621 Not Implemented
AS0331 # 09 Y:2002 09 2002 $819 $144 Implemented
AS0331 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $542 Implemented
AS0331 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $34,077 $400 Not Implemented
AS0331 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,966 $20 Implemented
AS0331 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $17,275 $26,928 Not Implemented
AS0331 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,752 $3,880 Not Implemented
AS0331 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $371 $63 Implemented
AS0331 # 07 Y:2002 07 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $398 $0 Not Implemented
AS0331 # 08 Y:2002 08 2002 $89,018 $19,710 Implemented
UF0301 # 08 Y:2002 08 2002 $70,176 $0 Not Implemented
UF0301 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,352 $134 Not Implemented
UF0301 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,016 $0 Not Implemented
UF0301 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $40,494 $1,035 Not Implemented
UF0301 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,517 $16,521 Not Implemented
UF0301 # 05 Y:2002 05 2002 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $51,092 $121,957 Not Implemented
UF0301 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,526 $1,768 Not Implemented
UF0301 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $0 Not Implemented
UF0301 # 09 Y:2002 09 2002 $56,304 $376 Not Implemented
OR0410 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,362 $0 Not Implemented
OR0410 # 03 Y:2002 03 2002 UPGRADE CONTROLS ON COMPRESSORS $3,700 $2,000 Not Implemented