IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0696 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $10,116 Not Implemented
OR0696 # 03 Y:2017 03 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,365 $5,880 Not Implemented
OR0696 # 02 Y:2017 02 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,265 $37,275 Not Implemented
OR0696 # 01 Y:2017 01 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $179,573 $3,044 Not Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
BS0106 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $48 Implemented
BS0106 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $275 Implemented
BS0105 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78 $165 Implemented
BS0105 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $1,020 Implemented
BS0105 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $7,451 $31,180 Not Implemented
BS0099 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $456 $7 Not Implemented
BS0099 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $260 Not Implemented
BS0099 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $13 Not Implemented
BS0099 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $428 $308 Not Implemented
BS0099 # 05 Y:2017 05 2017 TREAT AND REUSE RINSE WATERS $773 $7,514 Not Implemented
BS0099 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $789 $144 Not Implemented
BS0099 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $866 $2,440 Not Implemented
BS0099 # 02 Y:2017 02 2017 ADOPT IN-HOUSE MATERIAL GENERATION $7,623 $60,000 Not Implemented
BS0099 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $83,061 $200,000 Not Implemented
MI0311 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,177 $1,440 Implemented
MI0311 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,449 $10,720 Implemented
MI0311 # 08 Y:2017 08 2017 USE PHOTOCELL CONTROLS $938 $342 Implemented
MI0311 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $889 $1,320 Implemented
MI0311 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $97,830 $1,660 Implemented
MI0311 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,524 $10,000 Not Implemented