Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
176
matching recommendationsSIC | 2085 | Distilled And Blended Liquors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0820 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $1,000 | Implemented |
UK2005 # 07 Y:2021 | 07 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,605 | $3,000 | n/a |
UK2005 # 09 Y:2021 | 09 | 2021 | INSULATE BARE EQUIPMENT | $4,993 | $6,721 | n/a |
UK2005 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,065 | $3,580 | n/a |
UK2005 # 08 Y:2021 | 08 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $66,411 | $240,000 | n/a |
UK2005 # 03 Y:2021 | 03 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $5,104 | $3,740 | n/a |
UK2005 # 01 Y:2021 | 01 | 2021 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,303 | $5,660 | n/a |
UK2005 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $802 | $0 | n/a |
UK2005 # 04 Y:2021 | 04 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $9,505 | $5,250 | n/a |
UK2005 # 05 Y:2021 | 05 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,176 | $80 | n/a |
WV0601 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,170 | Implemented |
WV0601 # 04 Y:2020 | 04 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $4,392 | $6,660 | Implemented |
WV0601 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $13,900 | Implemented |
WV0601 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,355 | $1,691 | Implemented |
WV0601 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,303 | $10,560 | Implemented |
WV0601 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $514 | $1,425 | Implemented |
WV0601 # 02 Y:2020 | 02 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $15,085 | $15,000 | Implemented |
WV0601 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $137 | $530 | Implemented |
WV0601 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,944 | $3,000 | Implemented |
WV0601 # 01 Y:2020 | 01 | 2020 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,050 | $90,000 | Implemented |
UK2004 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,067 | $2,630 | Implemented |
UK2004 # 06 Y:2020 | 06 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $71,487 | $150,900 | Implemented |
UK2004 # 08 Y:2020 | 08 | 2020 | ELIMINATE A BY-PRODUCT | $293,614 | $53,800 | Not Implemented |
UK2004 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $102,672 | $4,000 | Implemented |
UK2004 # 09 Y:2020 | 09 | 2020 | OPTIMIZE PLANT POWER FACTOR | $40,258 | $23,660 | Implemented |