Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
181
matching recommendationsSIC | 2085 | Distilled And Blended Liquors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2004 # 04 Y:2020 | 04 | 2020 | INCREASE AMOUNT OF CONDENSATE RETURNED | $360,000 | $250,000 | Implemented |
UK2004 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,067 | $2,630 | Implemented |
UK2004 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,779 | $0 | Implemented |
UK2004 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,031 | $21,360 | Implemented |
UK2004 # 09 Y:2020 | 09 | 2020 | OPTIMIZE PLANT POWER FACTOR | $40,258 | $23,660 | Implemented |
UK2004 # 08 Y:2020 | 08 | 2020 | ELIMINATE A BY-PRODUCT | $293,614 | $53,800 | Not Implemented |
UK2004 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $102,672 | $4,000 | Implemented |
UK2004 # 06 Y:2020 | 06 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $71,487 | $150,900 | Implemented |
UK2004 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $52,668 | $24,890 | Implemented |
UK2003 # 07 Y:2020 | 07 | 2020 | MINIMIZE WATER USAGE | $27,840 | $15,000 | Implemented |
UK2003 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $10,287 | $6,825 | Not Implemented |
UK2003 # 05 Y:2020 | 05 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,645 | $28,100 | Implemented |
UK2003 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $4,628 | $1,586 | Implemented |
UK2003 # 03 Y:2020 | 03 | 2020 | REDUCE VENTILATION AIR | $5,372 | $4,560 | Not Implemented |
UK2003 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $660 | $0 | Not Implemented |
UK2003 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $2,200 | Not Implemented |
UK1911 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,560 | $3,950 | Implemented |
UK1911 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $45,696 | $27,825 | Implemented |
UK1911 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,273 | $24,987 | Implemented |
UK1911 # 08 Y:2019 | 08 | 2019 | INSULATE BARE EQUIPMENT | $26,686 | $9,826 | Not Implemented |
UK1911 # 07 Y:2019 | 07 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,750 | $0 | Not Implemented |
UK1911 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,615 | $7,400 | Not Implemented |
UK1911 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,363 | $700 | Implemented |
UK1911 # 02 Y:2019 | 02 | 2019 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $487,425 | $1,600,000 | Not Implemented |
UD0972 # 03 Y:2017 | 03 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,800 | $3,250 | Implemented |