IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 2085 Distilled And Blended Liquors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0972 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $1,400 Not Implemented
TT0081 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $89,000 $24,500 Not Implemented
TT0081 # 02 Y:2011 02 2011 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $204,112 $553,850 Not Implemented
TT0081 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,218 $44,000 Not Implemented
TT0081 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,662 $5 Not Implemented
TT0081 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,700 $103,900 Implemented
TT0081 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,694 $70,320 Implemented
TT0081 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $8,160 Implemented
TT0081 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,580 $22,680 Implemented
UF0446 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,055 $43,715 Not Implemented
UF0446 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,009 $1,320 Not Implemented
UF0446 # 03 Y:2011 03 2011 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,224 $3,045 Not Implemented
UF0446 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,392 $396 Not Implemented
UF0446 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,063 $0 Not Implemented
UF0446 # 06 Y:2011 06 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $86,813 $350,000 Not Implemented
UF0446 # 07 Y:2011 07 2011 COVER OPEN TANKS $2,910 $1,175 Not Implemented
UF0446 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,593 $25,700 Not Implemented
UF0446 # 09 Y:2011 09 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,662 $8,210 Not Implemented
SD0294 # 01 Y:2002 01 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,512 $6,000 Not Implemented
SD0294 # 02 Y:2002 02 2002 ISOLATE HOT OR COLD EQUIPMENT $3,123 $5,200 Not Implemented
SD0294 # 03 Y:2002 03 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,969 $2,000 Not Implemented
SD0294 # 04 Y:2002 04 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $501 $20 Not Implemented
SD0294 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,904 $2,000 Implemented
UL0233 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,210 $50 Implemented
UL0233 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,678 $261 Not Implemented