IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0249 # 06 Y:1995 06 1995 INSTALL TIMERS AND/OR THERMOSTATS $490 $560 Implemented
AM0249 # 07 Y:1995 07 1995 INSTALL SKYLIGHTS $115 $60 Not Implemented
AM0249 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $1,300 $900 Implemented
AM0249 # 09 Y:1995 09 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $883 $1,028 Not Implemented
KG0031 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,243 $10,000 Not Implemented
KG0031 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,088 $392 Not Implemented
KG0031 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,965 $2,750 Implemented
KG0031 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,436 $1,000 Not Implemented
KG0031 # 05 Y:1995 05 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $250 $65 Implemented
AM0244 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,970 $0 Implemented
AM0244 # 02 Y:1995 02 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,950 $110 Implemented
AM0244 # 03 Y:1995 03 1995 INSTALL SKYLIGHTS $4,340 $3,800 Implemented
AM0244 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $770 $0 Not Implemented
AM0244 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $530 $0 Implemented
AM0244 # 06 Y:1995 06 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $130 $0 Not Implemented
AM0102 # 01 Y:1990 01 1990 RECOVER WASTE HEAT FROM EQUIPMENT $15,000 $5,000 Implemented
AM0102 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $7,969 $12,000 Implemented
AM0102 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,400 $540 Implemented
AM0102 # 04 Y:1990 04 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,000 $2,740 Implemented
AM0102 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $106 Implemented
AM0102 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $0 Implemented
AM0102 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $40 Implemented
AM0102 # 08 Y:1990 08 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $488 $410 Implemented
AM0102 # 09 Y:1990 09 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $370 $150 Implemented
AM0093 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $10,825 $1,000 Implemented