Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0575 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,618 | $2,720 | n/a |
LE0575 # 07 Y:2024 | 07 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $83,526 | $121,547 | n/a |
LE0575 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $242,187 | $285,000 | n/a |
LE0575 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $37,603 | $28,720 | n/a |
LE0575 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118,088 | $80,000 | n/a |
LE0575 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45,906 | $7,700 | n/a |
LE0575 # 02 Y:2024 | 02 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $6,164 | $100 | n/a |
LE0575 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,173 | $100 | n/a |
TT0318 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $460 | n/a |
TT0318 # 07 Y:2024 | 07 | 2024 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,912 | $15,000 | n/a |
TT0318 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,885 | $12,180 | n/a |
TT0318 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,815 | $1,500 | n/a |
TT0318 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,027 | $65,640 | n/a |
TT0318 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,101 | $94 | n/a |
TT0318 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $25,497 | $30,000 | n/a |
TT0318 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $519,539 | $7,626,292 | n/a |
UW2409 # 07 Y:2024 | 07 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $24,670 | $223,625 | Implemented |
UW2409 # 06 Y:2024 | 06 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $72,261 | $271,830 | Implemented |
UW2409 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $61,679 | $155,400 | Implemented |
UW2409 # 04 Y:2024 | 04 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,446 | $18,600 | Implemented |
UW2409 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $1,034,601 | $300,000 | Implemented |
UW2409 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $1,927 | $2,080 | Implemented |
UW2409 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $240,871 | $7,750 | Implemented |
OR0786 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,491 | $0 | Implemented |
OR0786 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,522 | $2,500 | Implemented |