Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,757
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TP0004 # 05 Y:1999 | 05 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,165 | $346 | n/a |
TP0004 # 06 Y:1999 | 06 | 1999 | MINIMIZE WATER USAGE | $1,664 | $388 | n/a |
TP0004 # 07 Y:1999 | 07 | 1999 | RECOVER AND REUSE COOLING WATER | $1,313 | $1,224 | n/a |
TP0004 # 08 Y:1999 | 08 | 1999 | USE SYNTHETIC LUBRICANT | $557 | $0 | n/a |
HO0210 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,153 | $13,162 | Not Implemented |
HO0210 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $22,250 | $28,000 | Not Implemented |
HO0210 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,892 | $1,200 | Not Implemented |
HO0210 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,850 | $3,667 | Not Implemented |
HO0210 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,190 | $1,500 | Not Implemented |
HO0210 # 06 Y:1999 | 06 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $50,969 | $43,100 | Not Implemented |
HO0210 # 07 Y:1999 | 07 | 1999 | CHANGE OPERATING CONDITIONS | $15,421 | $500 | Not Implemented |
HO0210 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,740 | $180 | Not Implemented |
HO0210 # 09 Y:1999 | 09 | 1999 | MODIFY MATERIAL APPLICATION METHODS | $13,353 | $0 | Not Implemented |
HO0210 # 10 Y:1999 | 10 | 1999 | REDUCE OR ELIMINATE WASTE | $29,674 | $5,000 | Not Implemented |
HO0210 # 11 Y:1999 | 11 | 1999 | INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING | $15,834 | $6,000 | Not Implemented |
UD0572 # 01 Y:1999 | 01 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $948,600 | $580,553 | Not Implemented |
UD0572 # 02 Y:1999 | 02 | 1999 | USE PLASTIC PALLETS INSTEAD OF WOOD | $38,960 | $110,457 | Implemented |
UD0572 # 03 Y:1999 | 03 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $28,186 | $41,000 | Not Implemented |
UD0572 # 04 Y:1999 | 04 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $9,457 | $-27,115 | Implemented |
KU0514 # 01 Y:1999 | 01 | 1999 | USE OPTIMUM TEMPERATURE | $25,150 | $9,360 | Implemented |
KU0514 # 02 Y:1999 | 02 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,760 | $13,490 | Not Implemented |
KU0514 # 03 Y:1999 | 03 | 1999 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $2,250 | $280 | Implemented |
KU0514 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,950 | $3,040 | Not Implemented |
KU0514 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,300 | $1,960 | Not Implemented |
KU0514 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,120 | $860 | Implemented |