IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0178 # 08 Y:1985 08 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,912 $0 Not Implemented
KU0178 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $2,256 $1,600 Not Implemented
KU0178 # 10 Y:1985 10 1985 INSULATE BARE EQUIPMENT $698 $1,500 Not Implemented
KU0178 # 11 Y:1985 11 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $423 $50 Implemented
KU0178 # 12 Y:1985 12 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $423 $215 Not Implemented
KU0178 # 13 Y:1985 13 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $120 Implemented
KU0178 # 14 Y:1985 14 1985 IMPROVE LUBRICATION PRACTICES $466 $250 Not Implemented
KU0178 # 15 Y:1985 15 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $498 $200 Implemented
KU0178 # 16 Y:1985 16 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $446 $0 Implemented
KU0178 # 17 Y:1985 17 1985 INSULATE BARE EQUIPMENT $192 $75 Not Implemented
UD0167 # 01 Y:1985 01 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,239 $300 Not Implemented
UD0167 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,232 $10,000 Implemented
UD0167 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $1,280 Implemented
UD0167 # 04 Y:1985 04 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $616 $0 Implemented
UD0167 # 05 Y:1985 05 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $10,829 $29,613 Not Implemented
UD0167 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,387 $7,500 Not Implemented
UD0167 # 07 Y:1985 07 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,387 $7,500 Not Implemented
TN0214 # 01 Y:1984 01 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,671 $29,800 Not Implemented
TN0214 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,705 $1,000 Not Implemented
TN0214 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,407 $2,100 Not Implemented
TN0214 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $480 $627 Not Implemented
TN0214 # 05 Y:1984 05 1984 INSTALL SET-BACK TIMERS $826 $1,850 Not Implemented
TN0199 # 01 Y:1984 01 1984 HEAT WATER WITH EXHAUST HEAT $3,718 $10,800 Implemented
TN0199 # 02 Y:1984 02 1984 AIR CONDITION ONLY SPACE NECESSARY $1,733 $0 Implemented
TN0199 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,890 $800 Implemented