IAC Assessment: OK0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product SOFT DRINKS
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pieces
Production Hrs. Annual 3,380
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,415 655,920 kWh $0.07
Natural Gas $21,584 4,728 MMBtu $4.57
TOTAL ENERGY COSTS $64,999
RECOMMENDED SAVINGS* $3,003 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,685
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$134
Cost:
$70
$142 2,345 $(-8) (-2) - - $142
2,345
kWh
$(-8)
(-2)
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$746
Cost:
$100
$800 12,896 $(-81) (-20) $27 - $800
12,896
kWh
$(-81)
(-20)
MMBtu
$27
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$298
Cost:
-
$298 4,103 - - - - $298
4,103
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$281
Cost:
$800
- - $281 64 - - -
-
kWh
$281
64
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$61
Cost:
$193
- - $61 14 - - -
-
kWh
$61
14
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$204
Cost:
$550
- - $204 50 - - -
-
kWh
$204
50
MMBtu
-
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$976
Cost:
$2,400
- - $976 241 - - -
-
kWh
$976
241
MMBtu
-
-
$
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$178
Cost:
-
$164 2,638 - - $14 - $164
2,638
kWh
-
-
MMBtu
$14
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$54
Cost:
$62
$54 879 - - - - $54
879
kWh
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$71
Cost:
$83
$74 1,465 $(-3) (-1) - - $74
1,465
kWh
$(-3)
(-1)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,003
Cost:
$4,258
$1,532 24,326 $1,430 346 $41 - $1,532
24,326
kWh
$1,430
346
MMBtu
$41
-
$
TOTAL IMPLEMENTED Savings:
$1,685
Cost:
$865
$1,532 24,326 $112 27 $41 - $1,532
24,326
kWh
$112
27
MMBtu
$41
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes