Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1078 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $325 | $0 | Not Implemented |
OK1078 # 04 Y:2022 | 04 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,266 | $300 | Not Implemented |
OK1078 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,426 | $629 | Not Implemented |
OK1078 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,663 | $659 | Not Implemented |
OK1078 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,608 | $540,200 | Not Implemented |
OK0907 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,448 | $1,250 | Implemented |
OK0907 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,042 | $30,000 | Not Implemented |
OK0907 # 13 Y:2015 | 13 | 2015 | OPTIMIZE PLANT POWER FACTOR | $11,263 | $25,597 | Not Implemented |
OK0907 # 12 Y:2015 | 12 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,510 | $3,052 | Implemented |
OK0907 # 11 Y:2015 | 11 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,466 | $0 | Implemented |
OK0907 # 10 Y:2015 | 10 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,915 | $2,750 | Not Implemented |
OK0907 # 09 Y:2015 | 09 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,429 | $960 | Implemented |
OK0907 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,388 | $503 | Not Implemented |
OK0907 # 07 Y:2015 | 07 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,403 | $800 | Implemented |
OK0907 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,869 | $9,983 | Not Implemented |
OK0907 # 03 Y:2015 | 03 | 2015 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $20,444 | $1,413 | Not Implemented |
OK0907 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,302 | $332 | Implemented |
OK0907 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $1,237 | $706 | Implemented |
KU0514 # 03 Y:1999 | 03 | 1999 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $2,250 | $280 | Implemented |
KU0514 # 07 Y:1999 | 07 | 1999 | MINIMIZE WATER USAGE | $12,240 | $22,300 | Implemented |
KU0514 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $490 | $260 | Implemented |
KU0514 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,120 | $860 | Implemented |
KU0514 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,300 | $1,960 | Not Implemented |
KU0514 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,950 | $3,040 | Not Implemented |
KU0514 # 10 Y:1999 | 10 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $106,720 | $288,000 | Implemented |