IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1078 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $325 $0 Not Implemented
OK1078 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,266 $300 Not Implemented
OK1078 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,426 $629 Not Implemented
OK1078 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $659 Not Implemented
OK1078 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $31,608 $540,200 Not Implemented
OK0907 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $1,250 Implemented
OK0907 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $29,042 $30,000 Not Implemented
OK0907 # 13 Y:2015 13 2015 OPTIMIZE PLANT POWER FACTOR $11,263 $25,597 Not Implemented
OK0907 # 12 Y:2015 12 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,510 $3,052 Implemented
OK0907 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,466 $0 Implemented
OK0907 # 10 Y:2015 10 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,915 $2,750 Not Implemented
OK0907 # 09 Y:2015 09 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,429 $960 Implemented
OK0907 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,388 $503 Not Implemented
OK0907 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,403 $800 Implemented
OK0907 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,869 $9,983 Not Implemented
OK0907 # 03 Y:2015 03 2015 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $20,444 $1,413 Not Implemented
OK0907 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,302 $332 Implemented
OK0907 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,237 $706 Implemented
KU0514 # 03 Y:1999 03 1999 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,250 $280 Implemented
KU0514 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $12,240 $22,300 Implemented
KU0514 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $490 $260 Implemented
KU0514 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $1,120 $860 Implemented
KU0514 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,300 $1,960 Not Implemented
KU0514 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,950 $3,040 Not Implemented
KU0514 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,720 $288,000 Implemented