IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2003 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,667 $75 Not Implemented
LS2003 # 01 Y:2020 01 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,371 $250 Not Implemented
LS2003 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $586 $225 Implemented
LS2003 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $280 $75 Not Implemented
LS2003 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,429 $30,353 Not Implemented
LS1904 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,052 $20,000 Not Implemented
LS1904 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,763 $45,810 Implemented
LS1904 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $20,231 $10,000 Not Implemented
LS1904 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,713 $1,530 Not Implemented
LS1904 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $414,085 $84,000 Not Implemented
LS1904 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,536 $0 Implemented
LS1904 # 01 Y:2019 01 2019 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $0 Implemented
LS1812 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $50 Not Implemented
LS1812 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,243 $13,500 Not Implemented
LS1812 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,886 $17,000 Implemented
LS1812 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $17,980 $20,000 Not Implemented
LL0123 # 07 Y:2001 07 2001 DISCONNECT BALLASTS $909 $0 Implemented
LL0123 # 06 Y:2001 06 2001 USE PHOTOCELL CONTROLS $3,349 $333 Implemented
LL0123 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $119 $16 Not Implemented
LL0123 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $728 $111 Not Implemented
LL0123 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,389 $2,686 Implemented
LL0123 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $2,174 $1,308 Implemented
LL0123 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,416 $1,740 Implemented
AR0060 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,536 $3,550 Implemented
AR0060 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $200 Implemented