Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
170
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0127 # 01 Y:2006 | 01 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,212 | $0 | Implemented |
TA0127 # 05 Y:2006 | 05 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $60 | $93 | Not Implemented |
TA0127 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $625 | $100 | Implemented |
TA0127 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,752 | $0 | Implemented |
TA0127 # 03 Y:2006 | 03 | 2006 | INSTALL REPLACEMENT DOORS | $285 | $486 | Not Implemented |
LE0246 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,372 | $2,500 | Not Implemented |
LE0246 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,948 | $180,000 | Implemented |
LE0246 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $1,586 | $450 | Implemented |
LE0246 # 02 Y:2006 | 02 | 2006 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $14,590 | $20,000 | Not Implemented |
LE0246 # 01 Y:2006 | 01 | 2006 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $66,327 | $5,000 | Implemented |
LE0246 # 07 Y:2006 | 07 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $3,000 | $100 | Not Implemented |
LE0246 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,683 | $6,700 | Implemented |
LE0246 # 04 Y:2006 | 04 | 2006 | MINIMIZE WATER USAGE | $6,264 | $1,800 | Not Implemented |
LE0246 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,033 | $5,000 | Implemented |
OR0483 # 07 Y:2005 | 07 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $5,131 | $15,000 | Not Implemented |
OR0483 # 05 Y:2005 | 05 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,000 | $69,000 | Implemented |
OR0483 # 06 Y:2005 | 06 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,390 | $72,000 | Implemented |
OR0483 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $21,624 | $0 | Implemented |
OR0483 # 04 Y:2005 | 04 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $8,960 | $3,000 | Implemented |
OR0483 # 03 Y:2005 | 03 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $5,100 | Implemented |
OR0483 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $24,290 | $4,400 | Implemented |
UF0319 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $1,277 | $825 | Implemented |
UF0319 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,151 | $17,945 | Not Implemented |
UF0319 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $3,600 | $20,000 | Not Implemented |
UF0319 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,379 | $9,534 | Implemented |