IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,308

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0254 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,886 $0 Implemented
TN0254 # 06 Y:1985 06 1985 USE MINIMUM STEAM OPERATING PRESSURE $595 $0 Implemented
TN0254 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $225 Implemented
TN0254 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $197 $117 Implemented
UD0166 # 01 Y:1985 01 1985 RECOVER AND REUSE COOLING WATER $10,849 $7,160 Implemented
UD0166 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,600 $40,000 Implemented
UD0166 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,258 $50,000 Implemented
CO0028 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,738 $620 Implemented
CO0028 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,873 $150,000 Implemented
CO0028 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,370 $10,000 Implemented
CO0028 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $653 $300 Implemented
CO0028 # 05 Y:1985 05 1985 AIR CONDITION ONLY SPACE NECESSARY $264 $2,000 Implemented
CO0028 # 06 Y:1985 06 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,158 $5,000 Implemented
CO0028 # 08 Y:1985 08 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $1,140 Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented
GT0226 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $7,999 $10,000 Implemented
GT0226 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $104 Implemented
KU0123 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $522 $100 Implemented
KU0123 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14 $20 Implemented
KU0123 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $112 $100 Implemented
KU0123 # 06 Y:1984 06 1984 INSTALL AUTOMATIC STACK DAMPER $44 $150 Implemented
GT0194 # 01 Y:1983 01 1983 INSTALL TIMERS AND/OR THERMOSTATS $630 $1,500 Implemented