IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0749 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $999 $0 Implemented
OR0749 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $43,522 $28,094 Not Implemented
OR0749 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,003 $11,329 Implemented
OR0749 # 04 Y:2022 04 2022 REPLACE BOILER $122,100 $1,640,000 Implemented
OR0744 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $2,348 $0 Implemented
OR0744 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $15,238 $36,792 Implemented
OR0744 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,963 $2,340 Implemented
OR0744 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,766 $8,671 Not Implemented
OR0744 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,065 $18,105 Implemented
LE0513 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,214 $1,500 Not Implemented
LE0513 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,500 Not Implemented
LE0513 # 03 Y:2021 03 2021 USE OPTIMUM TEMPERATURE $1,846 $2,500 Not Implemented
LE0513 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $362 $1,250 Not Implemented
LE0513 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,170 $9,500 Not Implemented
LE0513 # 06 Y:2021 06 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,313 $22,000 Not Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented
OR0742 # 02 Y:2021 02 2021 REDESIGN PROCESS $3,895 $0 Implemented
OR0742 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,662 $6,857 Not Implemented
OR0742 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,200 $38,018 Not Implemented
LS2112 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $289 $38 Not Implemented
LS2112 # 02 Y:2021 02 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,132 $300 Implemented
LS2112 # 03 Y:2021 03 2021 USE PHOTOCELL CONTROLS $662 $111 Not Implemented
LS2112 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $540 Implemented
LS2112 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,304 $8,316 Implemented
LS2112 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $285 $445 Not Implemented