IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,053

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented
KU0505 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $190,000 $333,750 Not Implemented
KU0505 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $75,000 $193,000 Implemented
KU0505 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,940 $2,560 Implemented
ME0253 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,662 $83,099 Implemented
ME0253 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,977 $26,897 Implemented
ME0253 # 03 Y:1998 03 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,878 $10,000 Implemented
ME0253 # 04 Y:1998 04 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,836 $29,200 Not Implemented
ME0253 # 05 Y:1998 05 1998 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $1,600 $3,600 Not Implemented
ME0253 # 06 Y:1998 06 1998 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,571 $5,022 Implemented
ME0253 # 07 Y:1998 07 1998 PAY UTILITY BILLS ON TIME $1,227 $0 Implemented
ME0253 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $92,343 $1,105,000 Not Implemented
ME0253 # 09 Y:1998 09 1998 RECOVER AND REUSE COOLING WATER $1,436 $1,150 Not Implemented
MS0106 # 01 Y:1998 01 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,778 $4,246 Implemented
MS0106 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $13,737 Not Implemented
MS0106 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,667 $22,209 Not Implemented
MS0106 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $723 $0 Implemented
MS0106 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,588 $1,920 Implemented
UF0197 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $3,682 Not Implemented
UF0197 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,334 $1,200 Implemented
UF0197 # 03 Y:1998 03 1998 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $15,069 $63,950 Not Implemented
UF0197 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $15,614 Implemented
UF0197 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,990 $1,150 Implemented
UF0197 # 06 Y:1998 06 1998 UTILIZE OUTSIDE CONTRACTING $108 $0 Not Implemented
UF0197 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,315 $7,000 Not Implemented