Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,040
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0106 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,778 | $4,246 | Implemented |
MS0106 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,362 | $13,737 | Not Implemented |
MS0106 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,667 | $22,209 | Not Implemented |
MS0106 # 04 Y:1998 | 04 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $723 | $0 | Implemented |
MS0106 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,588 | $1,920 | Implemented |
UF0197 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,885 | $3,682 | Not Implemented |
UF0197 # 02 Y:1998 | 02 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,334 | $1,200 | Implemented |
UF0197 # 03 Y:1998 | 03 | 1998 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $15,069 | $63,950 | Not Implemented |
UF0197 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,594 | $15,614 | Implemented |
UF0197 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,990 | $1,150 | Implemented |
UF0197 # 06 Y:1998 | 06 | 1998 | UTILIZE OUTSIDE CONTRACTING | $108 | $0 | Not Implemented |
UF0197 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,315 | $7,000 | Not Implemented |
UF0197 # 08 Y:1998 | 08 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,143 | $1,005 | Not Implemented |
UF0197 # 09 Y:1998 | 09 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $64,930 | $280,000 | Not Implemented |
KG0097 # 01 Y:1997 | 01 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,522 | $5,150 | n/a |
KG0097 # 02 Y:1997 | 02 | 1997 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $8,416 | $8,894 | n/a |
KG0097 # 03 Y:1997 | 03 | 1997 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $90,970 | $800 | n/a |
KG0097 # 04 Y:1997 | 04 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $596,163 | $8,894 | n/a |
KG0097 # 05 Y:1997 | 05 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $30,888 | $43,000 | n/a |
OR0302 # 01 Y:1997 | 01 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $370,800 | $345,000 | Not Implemented |
OR0302 # 02 Y:1997 | 02 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $78,667 | $5,000 | Implemented |
OR0302 # 03 Y:1997 | 03 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $25,630 | $73,000 | Implemented |
OR0302 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,448 | $130,000 | Implemented |
OR0302 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,141 | $8,464 | Implemented |
OR0302 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,613 | $1,000 | Not Implemented |