IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2303 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,504 $0 Not Implemented
UL2303 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $43,641 $26,163 Not Implemented
UL2303 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,439 $34,126 Not Implemented
UL2303 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,140 $7,650 Not Implemented
UL2303 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $36,831 $336,395 Not Implemented
UL2303 # 06 Y:2023 06 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $7,161 $21,450 Not Implemented
UL2303 # 07 Y:2023 07 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,194 $25,900 Not Implemented
UL0248 # 02 Y:2000 02 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $51,600 $6,600 Implemented
UL0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $15,352 Implemented
UL0248 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,000 $3,318 Not Implemented
UL0175 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,326 $130 Implemented
UL0175 # 08 Y:1996 08 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $191,332 $265,000 Implemented
UL0175 # 07 Y:1996 07 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $975 $300 Not Implemented
UL0175 # 06 Y:1996 06 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,010 $250 Not Implemented
UL0175 # 05 Y:1996 05 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,527 $0 Not Implemented
UL0175 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,217 $7,907 Not Implemented
UL0175 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $775 $200 Not Implemented
UL0175 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $104 $1,770 Implemented
UL0166 # 02 Y:1996 02 1996 RECOVER AND REUSE WASTE MATERIAL $668 $0 Implemented
UL0166 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $662 $1,909 Not Implemented
UL0135 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,519 $40 Not Implemented
UL0135 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,967 $2,000 Not Implemented
UL0135 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $22,520 $14,135 Not Implemented
UL0135 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,731 $966 Not Implemented
UL0135 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,179 $30 Not Implemented