IAC Assessment: UL0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Tortillas and Chips
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 360
Plant Area (Sq.Ft.) 134,200
Annual Production 4,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,479 6,332,063 kWh $0.02
Electricity Demand $120,782 13,201 kW-months/year $9.15
Natural Gas $207,606 55,110 MMBtu $3.77
TOTAL ENERGY COSTS $589,008
RECOMMENDED SAVINGS* $202,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $192,762
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$104
Cost:
$1,770
$60 2,638 $44 5 - - - - - - - - $60
2,638
kWh
$44
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,326
Cost:
$130
$764 31,946 $562 62 - - - - - - - - $764
31,946
kWh
$562
62
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$775
Cost:
$200
- - - - $775 205 - - - - - - -
-
kWh
-
-
kW-months/year
$775
205
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,217
Cost:
$7,907
$779 32,532 $438 48 - - - - - - - - $779
32,532
kWh
$438
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,527
Cost:
-
- - - - - - - - $2,751 3,000 $1,776 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,751
3,000
lb
$1,776
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$2,010
Cost:
$250
- - - - - - - - $2,010 6,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,010
6,000
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$975
Cost:
$300
- - - - - - - - $975 2,500 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$975
2,500
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$191,332
Cost:
$265,000
- - - - - - $16,332 6,600,000 - - $175,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,332
6,600,000
Tgal
-
-
lb
$175,000
-
$
TOTAL RECOMMENDED Savings:
$202,266
Cost:
$275,557
$1,603 67,116 $1,044 115 $775 205 $16,332 6,600,000 $5,736 11,500 $176,776 - $1,603
67,116
kWh
$1,044
115
kW-months/year
$775
205
MMBtu
$16,332
6,600,000
Tgal
$5,736
11,500
lb
$176,776
-
$
TOTAL IMPLEMENTED Savings:
$192,762
Cost:
$266,900
$824 34,584 $606 67 - - $16,332 6,600,000 - - $175,000 - $824
34,584
kWh
$606
67
kW-months/year
-
-
MMBtu
$16,332
6,600,000
Tgal
-
-
lb
$175,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes