Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1996 |
Principal Product | Tortillas and Chips |
NAICS | n/a |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 360 |
Plant Area (Sq.Ft.) | 134,200 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $151,479 | 6,332,063 | kWh | $0.02 |
Electricity Demand | $120,782 | 13,201 | kW-months/year | $9.15 |
Natural Gas | $207,606 | 55,110 | MMBtu | $3.77 |
TOTAL ENERGY COSTS | $589,008 | |||
RECOMMENDED SAVINGS* | $202,266 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $192,762 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $104 Cost: $1,770 |
$60 | 2,638 | $44 | 5 | - | - | - | - | - | - | - | - |
$60 2,638 kWh |
$44 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,326 Cost: $130 |
$764 | 31,946 | $562 | 62 | - | - | - | - | - | - | - | - |
$764 31,946 kWh |
$562 62 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $775 Cost: $200 |
- | - | - | - | $775 | 205 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$775 205 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,217 Cost: $7,907 |
$779 | 32,532 | $438 | 48 | - | - | - | - | - | - | - | - |
$779 32,532 kWh |
$438 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $4,527 Cost: - |
- | - | - | - | - | - | - | - | $2,751 | 3,000 | $1,776 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,751 3,000 lb |
$1,776 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,010 Cost: $250 |
- | - | - | - | - | - | - | - | $2,010 | 6,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,010 6,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $975 Cost: $300 |
- | - | - | - | - | - | - | - | $975 | 2,500 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$975 2,500 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $191,332 Cost: $265,000 |
- | - | - | - | - | - | $16,332 | 6,600,000 | - | - | $175,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,332 6,600,000 Tgal |
- - lb |
$175,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $202,266 Cost: $275,557 |
$1,603 | 67,116 | $1,044 | 115 | $775 | 205 | $16,332 | 6,600,000 | $5,736 | 11,500 | $176,776 | - | $1,603 67,116 kWh |
$1,044 115 kW-months/year |
$775 205 MMBtu |
$16,332 6,600,000 Tgal |
$5,736 11,500 lb |
$176,776 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $192,762 Cost: $266,900 |
$824 | 34,584 | $606 | 67 | - | - | $16,332 | 6,600,000 | - | - | $175,000 | - | $824 34,584 kWh |
$606 67 kW-months/year |
- - MMBtu |
$16,332 6,600,000 Tgal |
- - lb |
$175,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |