Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0025 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,096 $0 Implemented
MU0025 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $37 $50 Implemented
MU0025 # 04 Y:2023 04 2023 KEEP EQUIPMENT CLEAN $332 $0 Implemented
MU0025 # 05 Y:2023 05 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $382 $690 Not Implemented
MU0025 # 06 Y:2023 06 2023 USE OPTIMUM TEMPERATURE $1,361 $0 Implemented
MU0025 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,434 $2,876 Implemented
MU0025 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Implemented
MU0025 # 09 Y:2023 09 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,952 $19,852 Not Implemented
MU0025 # 10 Y:2023 10 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,348 $9,576 Not Implemented
MU0025 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,630 $360 Implemented
UM0245 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $1,000 Not Implemented
UM0245 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $225 Implemented
UM0245 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $7,700 Not Implemented
UM0245 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,670 $500 Not Implemented
UM0245 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,060 $12,288 Implemented
UM0245 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $7,445 $3,985 Not Implemented
UM0245 # 02 Y:2004 02 2004 REPLACE BOILER $13,000 $34,000 Not Implemented
UM0245 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $21,060 $2,288 Not Implemented
UM0082 # 05 Y:1997 05 1997 $115,000 $2,400 Implemented
UM0082 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,353 $3,800 Not Implemented
UM0082 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $5,039 $6,000 Not Implemented
UM0082 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,427 $3,920 Not Implemented
UM0082 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,892 $5,190 Implemented