IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0415 # 06 Y:2022 06 2022 INCREASE EFFICIENCY OF TRUCKS $15,778 $12,180 Not Implemented
MI0415 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $142,120 $2,400 Not Implemented
MI0415 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,830 $7,950 Not Implemented
MI0415 # 03 Y:2022 03 2022 REPLACE BOILER $73,846 $170,000 Not Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
MI0415 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $10,535 $3,084 Not Implemented
MI0371 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,343 $7,557 Implemented
MI0371 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $210 $407 Implemented
MI0371 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $473 $325 Implemented
MI0371 # 05 Y:2020 05 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,638 $2,460 Implemented
MI0371 # 04 Y:2020 04 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,708 $1,275 Implemented
MI0371 # 03 Y:2020 03 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,458 $5,640 Implemented
MI0371 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,462 $820 Implemented
MI0184 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,350 $920 Implemented
MI0184 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,667 $80 Not Implemented
MI0184 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,578 $320 Implemented
MI0184 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,867 $1,500 Implemented
MI0184 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $60,788 $640 Implemented
MI0160 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0160 # 07 Y:2008 07 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,440 $3,411 Not Implemented
MI0160 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,319 $24 Implemented
MI0160 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,705 $17,226 Implemented
MI0160 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,340 $15,475 Not Implemented
MI0160 # 03 Y:2008 03 2008 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $16,476 $474 Implemented
MI0160 # 02 Y:2008 02 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,048 $8,641 Not Implemented