IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0046 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,878 $349,862 n/a
TR0046 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $4,255 n/a
TR0046 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $18,016 $363 n/a
TR0042 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $141 $52 n/a
TR0042 # 03 Y:2022 03 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,544 $6,243 n/a
TR0042 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $33,568 $395,038 n/a
NT0005 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,375 $6,539 Not Implemented
NT0005 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $832,000 $100,000 Not Implemented
NT0005 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,885 $1,258 Not Implemented
NT0005 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $6,240 $0 Not Implemented
NT0005 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,810 $0 Not Implemented
NT0005 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $4,433 $9,008 Not Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
TR0008 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $692 $602 Not Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
AM0737 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $2,000 Implemented
AM0737 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $3,600 Implemented
AM0737 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $710 Implemented