IAC Assessment: TR0008
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0008
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2018
Principal Product Food: Tortillas
NAICS 311830 - Tortilla Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 46,000
Annual Production 2,626,000 Units
Production Hrs. Annual 5,510
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,565 800,764 kWh $0.10
Natural Gas $20,241 8,030 MMBtu $2.52
TOTAL ENERGY COSTS $97,806
RECOMMENDED SAVINGS* $48,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,223
#|Description Savings
Cost
Status Electricity Fees Primary Product Increase in Production Electricity Fees Primary Product Increase in Production
$ $ $ $ $ %
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,536
Cost:
$3,860
$1,536 - - - - - $1,536
-
$
-
-
$
-
-
%
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$692
Cost:
$602
$692 - - - - - $692
-
$
-
-
$
-
-
%
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$28,264
Cost:
$975
- - - - $28,264 - -
-
$
-
-
$
$28,264
-
%
04: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$13,889
Cost:
$1,000
$13,889 - - - - - $13,889
-
$
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$534
Cost:
$2,128
$534 - - - - - $534
-
$
-
-
$
-
-
%
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,464
Cost:
-
- - $3,464 - - - -
-
$
$3,464
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$48,380
Cost:
$8,565
$16,652 - $3,464 - $28,264 - $16,652
-
$
$3,464
-
$
$28,264
-
%
TOTAL IMPLEMENTED Savings:
$44,223
Cost:
$7,963
$15,959 - - - $28,264 - $15,959
-
$
-
-
$
$28,264
-
%
Savings
Cost
$ $ $ $ $ %
Electricity Fees Primary Product Increase in Production Electricity Fees Primary Product Increase in Production