IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0097 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,522 $5,150 n/a
KG0097 # 02 Y:1997 02 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,416 $8,894 n/a
KG0097 # 03 Y:1997 03 1997 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $90,970 $800 n/a
KG0097 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $30,888 $43,000 n/a
KG0097 # 04 Y:1997 04 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $596,163 $8,894 n/a
OR0302 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,223 $34,615 Implemented
OR0302 # 01 Y:1997 01 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $370,800 $345,000 Not Implemented
OR0302 # 02 Y:1997 02 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $78,667 $5,000 Implemented
OR0302 # 03 Y:1997 03 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $25,630 $73,000 Implemented
OR0302 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $2,410 $3,200 Not Implemented
OR0302 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,448 $130,000 Implemented
OR0302 # 07 Y:1997 07 1997 UPGRADE CONTROLS ON COMPRESSORS $4,077 $1,210 Not Implemented
OR0302 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,613 $1,000 Not Implemented
OR0302 # 12 Y:1997 12 1997 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $5,988 $300 Not Implemented
OR0302 # 11 Y:1997 11 1997 ELIMINATE/REDUCE AN OPERATION $7,267 $420 Implemented
OR0302 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,141 $8,464 Implemented
OR0302 # 08 Y:1997 08 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,300 $7,380 Not Implemented
OR0300 # 06 Y:1997 06 1997 INSTALL COMMON HEADER ON COMPRESSORS $1,105 $120 Implemented
OR0300 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,767 Implemented
OR0300 # 07 Y:1997 07 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,042 $1,000 Not Implemented
OR0300 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,358 $0 Implemented
OR0300 # 02 Y:1997 02 1997 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $400 $0 Implemented
OR0300 # 03 Y:1997 03 1997 USE LESS WASTEFUL PACKAGING $4,720 $0 Not Implemented
OR0300 # 04 Y:1997 04 1997 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $103 $0 Implemented
OR0300 # 01 Y:1997 01 1997 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $42,600 $0 Not Implemented