Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0212 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $37 | $108 | Implemented |
IA0212 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $279 | $372 | Implemented |
IA0212 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,330 | $21,549 | Implemented |
IA0212 # 04 Y:1998 | 04 | 1998 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $199,680 | $35,485 | Implemented |
IA0212 # 05 Y:1998 | 05 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $59,520 | $111,000 | Implemented |
IA0212 # 06 Y:1998 | 06 | 1998 | ELIMINATE/REDUCE AN OPERATION | $24,960 | $20,000 | Implemented |
IA0212 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,746 | $75 | Implemented |
OD0124 # 04 Y:1998 | 04 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,805 | $4,595 | Not Implemented |
OD0124 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,225 | $5,625 | Not Implemented |
OD0124 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,935 | $6,012 | Implemented |
OD0124 # 02 Y:1998 | 02 | 1998 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $437 | $1,290 | Not Implemented |
KU0505 # 07 Y:1998 | 07 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $190,000 | $333,750 | Not Implemented |
KU0505 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $20 | Implemented |
KU0505 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $720 | $340 | Implemented |
KU0505 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $510 | $260 | Implemented |
KU0505 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $400 | Implemented |
KU0505 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $9,600 | Implemented |
KU0505 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,940 | $2,560 | Implemented |
KU0505 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $75,000 | $193,000 | Implemented |
KU0505 # 06 Y:1998 | 06 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $800 | $0 | Implemented |
ME0253 # 09 Y:1998 | 09 | 1998 | RECOVER AND REUSE COOLING WATER | $1,436 | $1,150 | Not Implemented |
ME0253 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $92,343 | $1,105,000 | Not Implemented |
ME0253 # 06 Y:1998 | 06 | 1998 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,571 | $5,022 | Implemented |
ME0253 # 05 Y:1998 | 05 | 1998 | REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS | $1,600 | $3,600 | Not Implemented |
ME0253 # 03 Y:1998 | 03 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,878 | $10,000 | Implemented |