IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0006 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,688 $9,480 Implemented
KG0006 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $3,500 $1,350 Not Implemented
KG0006 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,449 $730 Implemented
KG0006 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $1,458 $270 Implemented
KG0006 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,036 $3,700 Not Implemented
KG0006 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $972 $188 Implemented
UF0090 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,450 $0 Implemented
UF0090 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,296 $19,877 Implemented
UF0090 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,852 $951 Implemented
UF0090 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,351 $8,499 Implemented
UF0090 # 05 Y:1994 05 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $8,930 $9,403 Implemented
UF0090 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $720 Not Implemented
UF0090 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,278 $4,190 Implemented
UF0090 # 08 Y:1994 08 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $738 $1,000 Not Implemented
UF0090 # 09 Y:1994 09 1994 HEAT WATER WITH EXHAUST HEAT $5,098 $1,800 Not Implemented
UF0090 # 10 Y:1994 10 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $21,205 $75,000 Not Implemented
MA0265 # 01 Y:1993 01 1993 COVER OPEN TANKS $7,538 $5,000 Implemented
MA0265 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,788 $12,305 Not Implemented
MA0265 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $12,420 Implemented
MA0265 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $114 $85 Not Implemented
MA0265 # 05 Y:1993 05 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $49,714 $17,787 Not Implemented
WI0169 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $34,181 $70,000 Not Implemented
WI0169 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,593 $2,100 Implemented
WI0169 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,001 $500 Not Implemented
WI0169 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $896 $1,454 Implemented