IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

461

matching recommendations
Reset
SIC 2096 Potato Chips And Similar Snacks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0002 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,704 $2,813 Implemented
AS0002 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $335 Not Implemented
AS0002 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $343 $427 Implemented
AS0002 # 08 Y:1990 08 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,815 $1,530 Not Implemented
AS0002 # 09 Y:1990 09 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $390 $1,300 Implemented
GT0399 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $615 $285 Not Implemented
GT0399 # 02 Y:1990 02 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $910 $300 Implemented
GT0399 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $840 $3,000 Not Implemented
GT0399 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,190 $3,930 Implemented
GT0399 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $5,000 Implemented
GT0399 # 06 Y:1990 06 1990 REPAIR AND ELIMINATE STEAM LEAKS $1,950 $50 Implemented
GT0399 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $229 Not Implemented
GT0399 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,088 $45,000 Implemented
AM0075 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,170 $28,650 Not Implemented
AM0075 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,222 $1,200 Implemented
AM0075 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,340 $16,650 Not Implemented
AM0075 # 04 Y:1989 04 1989 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,597 $1,000 Not Implemented
AM0075 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $2,845 $2,500 Not Implemented
AM0075 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,895 $270 Implemented
AM0075 # 07 Y:1989 07 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,085 $1,500 Implemented
AM0075 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $135 Not Implemented
AM0075 # 09 Y:1989 09 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $1,300 Implemented
OR0072 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $200 Implemented
OR0072 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $50 Not Implemented
OR0072 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40 $49 Implemented