IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2096 Potato Chips And Similar Snacks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0139 # 09 Y:1996 09 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,200 $0 Not Implemented
UF0139 # 08 Y:1996 08 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,118 $10,800 Not Implemented
UF0139 # 07 Y:1996 07 1996 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,581 $1,125 Not Implemented
UF0139 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,271 $35,000 Not Implemented
UF0139 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $350 Implemented
UF0139 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,372 $57,360 Not Implemented
UF0139 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $11,068 Not Implemented
UF0139 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $18,648 $0 Implemented
UF0139 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $75,430 $0 Implemented
UF0034 # 05 Y:1992 05 1992 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $51,194 $68,400 Not Implemented
UF0034 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $7,986 $5,200 Implemented
UF0034 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,213 $1,000 Implemented
UF0034 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $400 Implemented
UF0034 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $18,601 Implemented
UF0034 # 02 Y:1992 02 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,737 $14,960 Not Implemented
UF0034 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,358 $0 Not Implemented
UF0007 # 01 Y:1991 01 1991 INSTALL SPECTRAL REFLECTORS / DELAMP $8,472 $7,770 Not Implemented
UF0007 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56 $291 Not Implemented
UF0007 # 06 Y:1991 06 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $395 $2,443 Not Implemented
UF0007 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $928 $600 Not Implemented
UF0007 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $0 Not Implemented
UF0007 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,212 $0 Not Implemented
UF0007 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $818 $1,805 Not Implemented