Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
372
matching recommendationsSIC | 2096 | Potato Chips And Similar Snacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0207 # 01 Y:2025 | 01 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,560 | $0 | n/a |
IP0207 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $970 | $1,387 | n/a |
IP0207 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,162 | $5,708 | n/a |
IP0207 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $184 | $227 | n/a |
IP0207 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,969 | $3,653 | n/a |
IC0321 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $693 | $644 | n/a |
IC0321 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $706 | $565 | n/a |
IC0321 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $2,006 | $701 | n/a |
IC0321 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $19,153 | $1,152 | n/a |
IC0321 # 06 Y:2025 | 06 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,206 | $5,047 | n/a |
IC0321 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $1,211 | n/a |
IC0321 # 04 Y:2025 | 04 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,867 | $0 | n/a |
IC0321 # 10 Y:2025 | 10 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,444 | $0 | n/a |
IC0321 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $1,774 | n/a |
IC0321 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $7,389 | $352 | n/a |
IC0321 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $93,480 | $390,298 | n/a |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | Implemented |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | Implemented |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | Implemented |
UU0257 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,024 | $16,577 | Not Implemented |
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | Implemented |
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,000 | Implemented |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $1,000 | Implemented |
UD1070 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,729 | $2,893 | Not Implemented |
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | Not Implemented |