IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,489

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0020 # 06 Y:2013 06 2013 COVER OPEN TANKS $3,845 $6,050 Not Implemented
TT0114 # 01 Y:2013 01 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,820 $0 Implemented
TT0114 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42 $0 Implemented
TT0114 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,529 $125 Implemented
TT0114 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,310 $9,125 Not Implemented
TT0114 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $315 Implemented
TT0114 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,033 $5,950 Implemented
TT0114 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,988 $15,000 Not Implemented
BS0010 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $289 $630 Not Implemented
BS0010 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $222 $512 Implemented
BS0010 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,826 $750 Not Implemented
BS0010 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $251 Implemented
BS0010 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $70 $60 Not Implemented
LE0348 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,702 $24,000 Implemented
LE0348 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,828 $5,000 Not Implemented
LE0348 # 03 Y:2012 03 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,235 $43,550 Not Implemented
LE0348 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,951 $1,940 Not Implemented
LE0348 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $2,368 $2,300 Implemented
LE0348 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,650 $1,600 Implemented
LE0348 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,956 $5,700 Implemented
LE0348 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $120 $40 Not Implemented
BS0008 # 01 Y:2012 01 2012 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $9,360 $350 Not Implemented
BS0008 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,298 $14,400 Not Implemented
BS0008 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,079 $117 Not Implemented
BS0008 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $427 $227 Not Implemented