IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0124 # 02 Y:1998 02 1998 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $1,290 Not Implemented
OD0124 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,225 $5,625 Not Implemented
OD0124 # 04 Y:1998 04 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,805 $4,595 Not Implemented
KU0505 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $9,600 Implemented
KU0505 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $20 Implemented
KU0505 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $400 Implemented
KU0505 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $340 Implemented
KU0505 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $510 $260 Implemented
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented
KU0505 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $190,000 $333,750 Not Implemented
KU0505 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $75,000 $193,000 Implemented
KU0505 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,940 $2,560 Implemented
OR0300 # 01 Y:1997 01 1997 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $42,600 $0 Not Implemented
OR0300 # 02 Y:1997 02 1997 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $400 $0 Implemented
OR0300 # 03 Y:1997 03 1997 USE LESS WASTEFUL PACKAGING $4,720 $0 Not Implemented
OR0300 # 04 Y:1997 04 1997 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $103 $0 Implemented
OR0300 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,358 $0 Implemented
OR0300 # 06 Y:1997 06 1997 INSTALL COMMON HEADER ON COMPRESSORS $1,105 $120 Implemented
OR0300 # 07 Y:1997 07 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,042 $1,000 Not Implemented
OR0300 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,767 Implemented
OR0300 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $1,179 $2,200 Not Implemented
SF0122 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $219 $376 Implemented
SF0122 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,448 $7,560 Not Implemented
SF0122 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $196 $811 Not Implemented
SF0122 # 04 Y:1997 04 1997 MINIMIZE WATER USAGE $1,544 $60 Not Implemented