IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,473

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0203 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $700 Implemented
CO0203 # 11 Y:1991 11 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $400 $1,500 Implemented
CO0203 # 12 Y:1991 12 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,300 Implemented
CO0203 # 13 Y:1991 13 1991 INSTALL TIMERS AND/OR THERMOSTATS $660 $900 Implemented
CO0203 # 14 Y:1991 14 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $200 Implemented
CO0203 # 15 Y:1991 15 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,000 $1,700 Implemented
CO0203 # 16 Y:1991 16 1991 INSULATE BARE EQUIPMENT $1,300 $1,800 Implemented
KU0329 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,299 $1,500 Implemented
KU0329 # 02 Y:1990 02 1990 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,269 $6,000 Implemented
KU0329 # 03 Y:1990 03 1990 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,435 $9,600 Not Implemented
KU0329 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $700 Implemented
KU0329 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $523 $400 Implemented
KU0329 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,025 $0 Implemented
KU0329 # 07 Y:1990 07 1990 INSULATE BARE EQUIPMENT $3,165 $2,804 Implemented
GT0419 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,040 $8,500 Not Implemented
GT0419 # 02 Y:1990 02 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $460 $600 Not Implemented
GT0419 # 03 Y:1990 03 1990 REDUCE VENTILATION AIR $340 $800 Not Implemented
GT0419 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $52 Not Implemented
RU0085 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,252 $0 Implemented
RU0085 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,206 $500 Implemented
RU0085 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,262 $10,620 Implemented
RU0085 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,370 $0 Not Implemented
RU0085 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,011 $11,500 Not Implemented
RU0086 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,981 $21,083 Implemented
RU0086 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,121 $0 Implemented