IAC logo
IAC Assessment: WI0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product BREAD CRUMBS
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 170,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $719,807 10,704,865 kWh $0.07
Natural Gas $506,222 167,532 MMBtu $3.02
TOTAL ENERGY COSTS $1,226,029
RECOMMENDED SAVINGS* $103,593 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$73,453
Cost:
$200,000
$80,701 1,200,176 $(-7,248) (-2,400) - - $80,701
1,200,176
kWh
$(-7,248)
(-2,400)
MMBtu
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,715
Cost:
-
- - $3,715 1,230 - - -
-
kWh
$3,715
1,230
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$249
Cost:
-
$249 3,810 - - - - $249
3,810
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,538
Cost:
-
$12,138 - - - $(-1,600) - $12,138
-
kWh
-
-
MMBtu
$(-1,600)
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,206
Cost:
$5,000
- - $5,206 1,753 - - -
-
kWh
$5,206
1,753
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,976
Cost:
$4,900
- - $4,976 1,648 - - -
-
kWh
$4,976
1,648
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,759
Cost:
$1,920
$2,759 41,032 - - - - $2,759
41,032
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,012
Cost:
$1,520
- - $1,012 336 - - -
-
kWh
$1,012
336
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$120
Cost:
$1,774
$120 1,758 - - - - $120
1,758
kWh
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$713
Cost:
-
$713 10,551 - - - - $713
10,551
kWh
-
-
MMBtu
-
-
$
11: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$499
Cost:
$700
$499 6,155 - - - - $499
6,155
kWh
-
-
MMBtu
-
-
$
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$353
Cost:
-
$353 - - - - - $353
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,593
Cost:
$215,814
$97,532 1,263,482 $7,661 2,567 $(-1,600) - $97,532
1,263,482
kWh
$7,661
2,567
MMBtu
$(-1,600)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes