IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,473

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0086 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $500 Implemented
RU0086 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,885 $52,895 Implemented
RU0086 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,663 $350 Implemented
RU0086 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $38 Implemented
RU0086 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $17,528 $10,200 Implemented
OR0056 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $252 $0 Implemented
OR0056 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,873 $100 Implemented
OR0056 # 03 Y:1989 03 1989 MINIMIZE WATER USAGE $3,946 $1,683 Implemented
OR0056 # 04 Y:1989 04 1989 KEEP BOILER TUBES CLEAN $1,821 $100 Implemented
OR0056 # 05 Y:1989 05 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $377 $310 Not Implemented
OR0056 # 06 Y:1989 06 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,201 $2,750 Implemented
OR0056 # 07 Y:1989 07 1989 OPTIMIZE PLANT POWER FACTOR $294 $750 Not Implemented
OK0276 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $417 $180 Not Implemented
OK0276 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $0 Implemented
OK0276 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,650 Not Implemented
OK0276 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $541 Implemented
OK0276 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $845 $1,100 Not Implemented
OK0276 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $142 $366 Implemented
OK0276 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $0 Implemented
OK0276 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $248 $437 Implemented
UD0284 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,356 $20,000 Implemented
UD0284 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,285 $0 Implemented
UD0284 # 03 Y:1989 03 1989 INSTALL STORM WINDOWS AND DOORS $14,561 $55,000 Not Implemented
UD0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $0 Implemented
UD0284 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,648 $0 Implemented