Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0585 # 08 Y:2022 | 08 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,436 | $448 | Not Implemented |
UF0585 # 07 Y:2022 | 07 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $19,210 | $10,000 | Implemented |
UF0585 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $45,977 | $0 | Implemented |
UF0585 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,345 | $0 | Implemented |
UF0585 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,918 | $756 | Implemented |
UF0585 # 03 Y:2022 | 03 | 2022 | INSTALL TURBULATORS | $6,811 | $7,500 | Implemented |
UF0585 # 02 Y:2022 | 02 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $11,758 | $1,342 | Implemented |
UF0585 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,858 | $44,939 | Implemented |
MI0410 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,493 | $140 | Implemented |
MI0410 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,073 | $2,150 | Not Implemented |
MI0410 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $10,695 | Implemented |
MI0410 # 05 Y:2022 | 05 | 2022 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,575 | $597 | Implemented |
MI0410 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO HEAT WATER | $3,955 | $18,399 | Not Implemented |
MI0410 # 03 Y:2022 | 03 | 2022 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $5,890 | $80 | Not Implemented |
MI0410 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,151 | $7,280 | Implemented |
MI0410 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,438 | $580 | Implemented |
MI0408 # 01 Y:2022 | 01 | 2022 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $21,620 | $960 | Implemented |
MI0408 # 06 Y:2022 | 06 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $644 | $570 | Implemented |
MI0408 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,031 | $1,980 | Not Implemented |
MI0408 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,972 | $120 | Implemented |
MI0408 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,767 | $580 | Implemented |
MI0408 # 02 Y:2022 | 02 | 2022 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $5,828 | $2,327 | Implemented |