IAC logo
IAC Assessment: UF0585
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0585
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Spice Blends and Salad Dressings
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 300,000
Annual Production 10,000,000 Units
Production Hrs. Annual 6,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,666 8,353,090 kWh $0.02
Electricity Demand $120,136 17,212 kW-months/year $6.98
Electricity Fees $483,744 - $ -
Natural Gas $229,887 49,173 MMBtu $4.68
TOTAL ENERGY COSTS $1,391,000
RECOMMENDED SAVINGS* $116,313 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,877
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$21,858
Cost:
$44,939
$13,448 584,716 $8,410 1,205 - - - - - - $13,448
584,716
kWh
$8,410
1,205
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$11,758
Cost:
$1,342
- - - - $11,758 2,515 - - - - -
-
kWh
-
-
kW-months/year
$11,758
2,515
MMBtu
-
-
Tgal
-
-
$
03: 2.1222 INSTALL TURBULATORS Savings:
$6,811
Cost:
$7,500
- - - - $6,811 1,457 - - - - -
-
kWh
-
-
kW-months/year
$6,811
1,457
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,918
Cost:
$756
$4,918 213,841 - - - - - - - - $4,918
213,841
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,345
Cost:
-
$1,345 58,486 - - - - - - - - $1,345
58,486
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$45,977
Cost:
-
- - - - - - - - $45,977 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$45,977
-
$
07: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$19,210
Cost:
$10,000
$19,210 835,209 - - - - - - - - $19,210
835,209
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,436
Cost:
$448
$2,255 98,024 - - - - $2,181 972 - - $2,255
98,024
kWh
-
-
kW-months/year
-
-
MMBtu
$2,181
972
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$116,313
Cost:
$64,985
$41,176 1,790,276 $8,410 1,205 $18,569 3,972 $2,181 972 $45,977 - $41,176
1,790,276
kWh
$8,410
1,205
kW-months/year
$18,569
3,972
MMBtu
$2,181
972
Tgal
$45,977
-
$
TOTAL IMPLEMENTED Savings:
$111,877
Cost:
$64,537
$38,921 1,692,252 $8,410 1,205 $18,569 3,972 - - $45,977 - $38,921
1,692,252
kWh
$8,410
1,205
kW-months/year
$18,569
3,972
MMBtu
-
-
Tgal
$45,977
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost