Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2022 |
Principal Product | Spice Blends and Salad Dressings |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 10,000,000 Units |
Production Hrs. Annual | 6,200 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $194,666 | 8,353,090 | kWh | $0.02 |
Electricity Demand | $120,136 | 17,212 | kW-months/year | $6.98 |
Electricity Fees | $483,744 | - | $ | - |
Natural Gas | $229,887 | 49,173 | MMBtu | $4.68 |
TOTAL ENERGY COSTS | $1,391,000 | |||
RECOMMENDED SAVINGS* | $116,313 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $111,877 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $21,858 Cost: $44,939 |
$13,448 | 584,716 | $8,410 | 1,205 | - | - | - | - | - | - |
$13,448 584,716 kWh |
$8,410 1,205 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $11,758 Cost: $1,342 |
- | - | - | - | $11,758 | 2,515 | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,758 2,515 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1222 INSTALL TURBULATORS |
Savings: $6,811 Cost: $7,500 |
- | - | - | - | $6,811 | 1,457 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,811 1,457 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,918 Cost: $756 |
$4,918 | 213,841 | - | - | - | - | - | - | - | - |
$4,918 213,841 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,345 Cost: - |
$1,345 | 58,486 | - | - | - | - | - | - | - | - |
$1,345 58,486 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS |
Savings: $45,977 Cost: - |
- | - | - | - | - | - | - | - | $45,977 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$45,977 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $19,210 Cost: $10,000 |
$19,210 | 835,209 | - | - | - | - | - | - | - | - |
$19,210 835,209 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $4,436 Cost: $448 |
$2,255 | 98,024 | - | - | - | - | $2,181 | 972 | - | - |
$2,255 98,024 kWh |
- - kW-months/year |
- - MMBtu |
$2,181 972 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $116,313 Cost: $64,985 |
$41,176 | 1,790,276 | $8,410 | 1,205 | $18,569 | 3,972 | $2,181 | 972 | $45,977 | - | $41,176 1,790,276 kWh |
$8,410 1,205 kW-months/year |
$18,569 3,972 MMBtu |
$2,181 972 Tgal |
$45,977 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $111,877 Cost: $64,537 |
$38,921 | 1,692,252 | $8,410 | 1,205 | $18,569 | 3,972 | - | - | $45,977 | - | $38,921 1,692,252 kWh |
$8,410 1,205 kW-months/year |
$18,569 3,972 MMBtu |
- - Tgal |
$45,977 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost |