IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0208 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,665 $4,340 Not Implemented
LL0208 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,657 $30 Not Implemented
LL0208 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,402 $1,225 Not Implemented
LL0208 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,715 $640 Not Implemented
LL0208 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $12,869 $480 Not Implemented
LL0208 # 08 Y:2004 08 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,187 $660 Not Implemented
LL0208 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $2,585 $600 Not Implemented
LL0208 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,090 $6,000 Not Implemented
LL0208 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,385 $1,317 Not Implemented
LL0208 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,748 $166,850 Not Implemented
AS0389 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,971 $7,343 Implemented
AS0389 # 04 Y:2004 04 2004 USE GRAVITY FEEDS WHEREVER POSSIBLE $345 $150 Not Implemented
AS0389 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $506 Not Implemented
AS0389 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,163 $1,698 Implemented
AS0389 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,306 $12,480 Not Implemented
MI0092 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $405 $38,956 Not Implemented
MI0092 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,031 $1,350 Implemented
MI0092 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,474 $223 Not Implemented
MI0092 # 02 Y:2004 02 2004 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $21,190 $50,000 Implemented
MI0092 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $0 Not Implemented
MI0092 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $27,250 $720 Not Implemented
SF0287 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,741 $0 Implemented
SF0287 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,664 $0 Implemented
SF0287 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,058 $0 Not Implemented
SF0287 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,720 $0 Implemented