IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0307 # 14 Y:2017 14 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $359 $40 Implemented
MI0307 # 13 Y:2017 13 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $692 $240 Implemented
MI0307 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $12,345 $3,600 Implemented
MI0307 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,777 $23,135 Implemented
MI0307 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,347 $1,660 Implemented
MI0307 # 07 Y:2017 07 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,323 $1,720 Implemented
MI0307 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,536 $3,370 Implemented
MI0202 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $24,647 $9,000 Implemented
MI0202 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,531 $62,700 Implemented
MI0202 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,679 $1,320 Implemented
MI0202 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,267 $50 Implemented
UF0422 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,761 $0 Implemented
UF0422 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,882 $26,728 Implemented
UF0422 # 03 Y:2009 03 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,291 $261 Implemented
UF0422 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,614 $1,161 Implemented
MI0126 # 06 Y:2006 06 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,242 $140 Implemented
MI0126 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,474 $0 Implemented
MI0126 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,497 $1,750 Implemented
MI0126 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,331 $212 Implemented
MI0126 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $8,323 $1,020 Implemented
MI0126 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,617 $16,000 Implemented
UF0304 # 07 Y:2002 07 2002 CHANGE OPERATING CONDITIONS $6,000 $472 Implemented
UF0304 # 05 Y:2002 05 2002 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $7,014 $0 Implemented
UF0304 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,432 $110,539 Implemented
UF0304 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $10,725 Implemented