Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0307 # 14 Y:2017 | 14 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $359 | $40 | Implemented |
MI0307 # 13 Y:2017 | 13 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $692 | $240 | Implemented |
MI0307 # 08 Y:2017 | 08 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,536 | $3,370 | Implemented |
MI0307 # 07 Y:2017 | 07 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,323 | $1,720 | Implemented |
MI0307 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,347 | $1,660 | Implemented |
MI0307 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,777 | $23,135 | Implemented |
MI0307 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,345 | $3,600 | Implemented |
MI0202 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,267 | $50 | Implemented |
MI0202 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,679 | $1,320 | Implemented |
MI0202 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,531 | $62,700 | Implemented |
MI0202 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,647 | $9,000 | Implemented |
UF0422 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,614 | $1,161 | Implemented |
UF0422 # 05 Y:2009 | 05 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,761 | $0 | Implemented |
UF0422 # 03 Y:2009 | 03 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $9,291 | $261 | Implemented |
UF0422 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,882 | $26,728 | Implemented |
MI0126 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,497 | $1,750 | Implemented |
MI0126 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,474 | $0 | Implemented |
MI0126 # 06 Y:2006 | 06 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,242 | $140 | Implemented |
MI0126 # 03 Y:2006 | 03 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,331 | $212 | Implemented |
MI0126 # 02 Y:2006 | 02 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,323 | $1,020 | Implemented |
MI0126 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,617 | $16,000 | Implemented |
UF0304 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,492 | $10,725 | Implemented |
UF0304 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,432 | $110,539 | Implemented |
UF0304 # 07 Y:2002 | 07 | 2002 | CHANGE OPERATING CONDITIONS | $6,000 | $472 | Implemented |
UF0304 # 05 Y:2002 | 05 | 2002 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $7,014 | $0 | Implemented |