IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,279

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0168 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,596 $0 Implemented
AS0168 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $306 $300 Not Implemented
AS0168 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $38,756 $1,750 Implemented
AS0168 # 06 Y:1996 06 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,824 $0 Implemented
AS0168 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,044 $20,000 Not Implemented
AS0168 # 08 Y:1996 08 1996 REDUCE HEAT GAIN BY WINDOW TINTING $2,966 $10,750 Not Implemented
AS0168 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,991 $7,201 Implemented
AS0168 # 10 Y:1996 10 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $228 $0 Implemented
AS0168 # 11 Y:1996 11 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,557 $11,870 Implemented
AS0168 # 12 Y:1996 12 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,967 $8,690 Implemented
AS0168 # 13 Y:1996 13 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,455 $1,200 Implemented
OD0053 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,083 $3,453 Not Implemented
OD0053 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,634 $13,680 Not Implemented
OD0053 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,177 $4,271 Not Implemented
OD0053 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,848 $1,600 Not Implemented
OD0053 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,340 $700 Not Implemented
OD0053 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $757 $1,534 Not Implemented
OD0053 # 07 Y:1996 07 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $163,438 $36,960 Not Implemented
GT0573 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $317 $400 Not Implemented
GT0573 # 02 Y:1995 02 1995 ISOLATE HOT OR COLD EQUIPMENT $205 $480 Not Implemented
GT0573 # 03 Y:1995 03 1995 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,950 $6,270 Implemented
GT0573 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,462 $2,290 Not Implemented
GT0574 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,205 $26,520 Not Implemented
GT0574 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,668 $2,683 Not Implemented
GT0574 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,516 $200 Not Implemented