IAC Assessment: OD0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Dyed and finished fabric
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 323
Plant Area (Sq.Ft.) 277,000
Annual Production 96,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $457,208 15,100,235 kWh $0.03
Electricity Demand $278,861 28,831 kW-months/year $9.67
Electricity Fees $63,186 - $ -
LPG $406,248 85,688 MMBtu $4.74
Fuel Oil #6 $769,847 313,599 MMBtu $2.45
Coal $27,225 21,450 MMBtu $1.27
TOTAL ENERGY COSTS $2,028,783
RECOMMENDED SAVINGS* $220,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Coal Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #6 Coal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,083
Cost:
$3,453
$8,299 274,033 $3,784 391 - - - - - - $8,299
274,033
kWh
$3,784
391
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,634
Cost:
$13,680
$6,704 221,278 $2,930 303 - - - - - - $6,704
221,278
kWh
$2,930
303
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,177
Cost:
$4,271
$809 26,084 $368 38 - - - - - - $809
26,084
kWh
$368
38
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,848
Cost:
$1,600
$12,848 424,091 - - - - - - - - $12,848
424,091
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$20,340
Cost:
$700
- - - - $20,340 8,302 - - - - -
-
kWh
-
-
kW-months/year
$20,340
8,302
MMBtu
-
-
MMBtu
-
-
lb
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$757
Cost:
$1,534
- - - - $488 199 $269 163 - - -
-
kWh
-
-
kW-months/year
$488
199
MMBtu
$269
163
MMBtu
-
-
lb
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$163,438
Cost:
$36,960
- - - - - - - - $163,438 748,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$163,438
748,000
lb
TOTAL RECOMMENDED Savings:
$220,277
Cost:
$62,198
$28,660 945,486 $7,082 732 $20,828 8,501 $269 163 $163,438 748,000 $28,660
945,486
kWh
$7,082
732
kW-months/year
$20,828
8,501
MMBtu
$269
163
MMBtu
$163,438
748,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #6 Coal Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #6 Coal Solid Waste (non-haz)