Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Old Dominion Univ. |
---|---|
Assessment Year | 1996 |
Principal Product | Dyed and finished fabric |
NAICS | n/a |
SIC | 2269 - Finishing Plants, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 323 |
Plant Area (Sq.Ft.) | 277,000 |
Annual Production | 96,000 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $457,208 | 15,100,235 | kWh | $0.03 |
Electricity Demand | $278,861 | 28,831 | kW-months/year | $9.67 |
Electricity Fees | $63,186 | - | $ | - |
LPG | $406,248 | 85,688 | MMBtu | $4.74 |
Fuel Oil #6 | $769,847 | 313,599 | MMBtu | $2.45 |
Coal | $27,225 | 21,450 | MMBtu | $1.27 |
TOTAL ENERGY COSTS | $2,028,783 | |||
RECOMMENDED SAVINGS* | $220,277 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Coal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #6 | Coal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $12,083 Cost: $3,453 |
$8,299 | 274,033 | $3,784 | 391 | - | - | - | - | - | - |
$8,299 274,033 kWh |
$3,784 391 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $9,634 Cost: $13,680 |
$6,704 | 221,278 | $2,930 | 303 | - | - | - | - | - | - |
$6,704 221,278 kWh |
$2,930 303 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,177 Cost: $4,271 |
$809 | 26,084 | $368 | 38 | - | - | - | - | - | - |
$809 26,084 kWh |
$368 38 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,848 Cost: $1,600 |
$12,848 | 424,091 | - | - | - | - | - | - | - | - |
$12,848 424,091 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $20,340 Cost: $700 |
- | - | - | - | $20,340 | 8,302 | - | - | - | - |
- - kWh |
- - kW-months/year |
$20,340 8,302 MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $757 Cost: $1,534 |
- | - | - | - | $488 | 199 | $269 | 163 | - | - |
- - kWh |
- - kW-months/year |
$488 199 MMBtu |
$269 163 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $163,438 Cost: $36,960 |
- | - | - | - | - | - | - | - | $163,438 | 748,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$163,438 748,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $220,277 Cost: $62,198 |
$28,660 | 945,486 | $7,082 | 732 | $20,828 | 8,501 | $269 | 163 | $163,438 | 748,000 | $28,660 945,486 kWh |
$7,082 732 kW-months/year |
$20,828 8,501 MMBtu |
$269 163 MMBtu |
$163,438 748,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Coal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #6 | Coal | Solid Waste (non-haz) |