IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0228 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $2,100 Implemented
GT0228 # 07 Y:1984 07 1984 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,600 $3,000 Implemented
TN0232 # 01 Y:1984 01 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $31,111 $4,573 Implemented
TN0232 # 02 Y:1984 02 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,721 $18,050 Not Implemented
TN0232 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,298 $0 Implemented
TN0232 # 04 Y:1984 04 1984 COVER OPEN TANKS $5,089 $2,750 Not Implemented
TN0232 # 05 Y:1984 05 1984 REPAIR AND ELIMINATE STEAM LEAKS $3,742 $140 Implemented
TN0232 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $2,734 $855 Not Implemented
TN0232 # 07 Y:1984 07 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,670 $462 Implemented
GT0230 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $732 $151 Implemented
GT0230 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $97 Implemented
GT0230 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $960 $0 Not Implemented
GT0230 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,770 $1,200 Not Implemented
GT0232 # 07 Y:1984 07 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $940 $1,582 Implemented
GT0232 # 08 Y:1984 08 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,500 $14,000 Not Implemented
GT0232 # 09 Y:1984 09 1984 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $820 $6,438 Not Implemented
GT0232 # 01 Y:1984 01 1984 ISOLATE HOT OR COLD EQUIPMENT $4,600 $1,000 Implemented
GT0232 # 02 Y:1984 02 1984 MODIFY TEXTILE DRYERS $9,110 $7,500 Implemented
GT0232 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $2,957 Implemented
GT0232 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,240 $4,800 Not Implemented
GT0232 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,370 $2,000 Implemented
GT0232 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $500 Not Implemented
GT0233 # 01 Y:1984 01 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,800 $8,000 Not Implemented
GT0233 # 02 Y:1984 02 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,000 $100 Implemented
GT0233 # 03 Y:1984 03 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,800 $17,000 Not Implemented