IAC logo
IAC Assessment: GT0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1985
Principal Product CARPET DYEING
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 36,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $341,138 7,961,899 kWh $0.04
Natural Gas $2,743,687 595,226 MMBtu $4.61
Fuel Oil #6 $91,584 18,483 MMBtu $4.96
TOTAL ENERGY COSTS $3,176,409
RECOMMENDED SAVINGS* $765,729 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $308,729
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,550
Cost:
$2,883
$2,550 59,789 - - $2,550
59,789
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$979
Cost:
$820
$979 22,860 - - $979
22,860
kWh
-
-
MMBtu
03: 2.5123 REDUCE FLUID FLOW RATES Savings:
$10,900
Cost:
$25,000
- - $10,900 2,430 -
-
kWh
$10,900
2,430
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$17,100
Cost:
$800
- - $17,100 3,810 -
-
kWh
$17,100
3,810
MMBtu
05: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$40,100
Cost:
$50,000
- - $40,100 8,930 -
-
kWh
$40,100
8,930
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$99,000
Cost:
$120,000
- - $99,000 22,100 -
-
kWh
$99,000
22,100
MMBtu
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$191,000
Cost:
$150,000
- - $191,000 42,560 -
-
kWh
$191,000
42,560
MMBtu
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$156,100
Cost:
$82,500
- - $156,100 34,760 -
-
kWh
$156,100
34,760
MMBtu
09: 2.5191 MODIFY DYE BECK Savings:
$146,000
Cost:
$45,000
- - $146,000 32,500 -
-
kWh
$146,000
32,500
MMBtu
10: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$102,000
Cost:
$7,000
- - $102,000 22,800 -
-
kWh
$102,000
22,800
MMBtu
TOTAL RECOMMENDED Savings:
$765,729
Cost:
$484,003
$3,529 82,649 $762,200 169,890 $3,529
82,649
kWh
$762,200
169,890
MMBtu
TOTAL IMPLEMENTED Savings:
$308,729
Cost:
$106,503
$3,529 82,649 $305,200 68,040 $3,529
82,649
kWh
$305,200
68,040
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas