IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,178

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0170 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,220 $15 Implemented
TN0170 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,840 $500 Implemented
TN0170 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,000 Implemented
TN0170 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $13,230 $4,000 Implemented
TN0176 # 01 Y:1983 01 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,124 $5,000 Not Implemented
UD0098 # 01 Y:1983 01 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $37,152 $36,000 Not Implemented
UD0098 # 02 Y:1983 02 1983 INSTALL STORM WINDOWS AND DOORS $9,286 $8,000 Not Implemented
UD0098 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $590 Not Implemented
UD0098 # 04 Y:1983 04 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,313 $11,424 Not Implemented
UD0098 # 05 Y:1983 05 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,383 $0 Not Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0183 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,268 $1,790 Not Implemented
GT0187 # 01 Y:1983 01 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,140 $1,200 Not Implemented
GT0187 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,977 $22,034 Implemented
GT0187 # 03 Y:1983 03 1983 MODIFY DYE BECK $1,338 $600 Implemented
GT0187 # 04 Y:1983 04 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,618 $24,000 Implemented
GT0187 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,193 $500 Not Implemented
GT0187 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,160 $1,088 Not Implemented
GT0187 # 07 Y:1983 07 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $172 $138 Not Implemented
TN0173 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $411 $200 Not Implemented
TN0173 # 02 Y:1983 02 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,800 $1,000 Not Implemented
TN0173 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $1,600 $0 Not Implemented
GT0179 # 01 Y:1983 01 1983 CONTROL PRESSURE ON STEAMER OPERATIONS $165,000 $5,000 Not Implemented