IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0457 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $2,200 Not Implemented
LE0457 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,771 $10,041 Implemented
LE0457 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,554 $25,157 Implemented
LE0457 # 04 Y:2018 04 2018 REPLACE BOILER $33,772 $150,000 Not Implemented
LE0450 # 08 Y:2018 08 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,463 $22,000 Not Implemented
LE0450 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,023 $1,625 Not Implemented
LE0450 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,802 $3,000 Not Implemented
LE0450 # 02 Y:2018 02 2018 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $16,243 $8,000 Not Implemented
LE0450 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,167 $1,000 Not Implemented
LE0450 # 06 Y:2018 06 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,038 $8,000 Not Implemented
LE0450 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,470 Not Implemented
LE0450 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,643 $36,750 Not Implemented
LE0421 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $3,500 Implemented
LE0421 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $14,759 $2,175 Implemented
LE0421 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,883 $1,000 Implemented
LE0421 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,781 $1,800 Implemented
LE0421 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $965 $725 Implemented
LE0421 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $3,125 Not Implemented
LE0421 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $1,000 Not Implemented
LE0421 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,592 $9,000 Not Implemented
LE0421 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $697 $2,000 Implemented
LE0421 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $7,590 Implemented
LE0421 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,106 $4,800 Implemented
LE0421 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $971 $4,320 Not Implemented
LE0421 # 12 Y:2016 12 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,515 $16,250 Not Implemented