Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0576 # 03 Y:2016 | 03 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $198,172 | $1,100,000 | Not Implemented |
NC0576 # 04 Y:2016 | 04 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $60,776 | $250,000 | Not Implemented |
LE0421 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $14,759 | $2,175 | Implemented |
LE0421 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,883 | $1,000 | Implemented |
LE0421 # 03 Y:2016 | 03 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $2,781 | $1,800 | Implemented |
LE0421 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $965 | $725 | Implemented |
LE0421 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,141 | $3,125 | Not Implemented |
LE0421 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $550 | $1,000 | Not Implemented |
LE0421 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,592 | $9,000 | Not Implemented |
LE0421 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $697 | $2,000 | Implemented |
LE0421 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,870 | $7,590 | Implemented |
LE0421 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,106 | $4,800 | Implemented |
LE0421 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $971 | $4,320 | Not Implemented |
LE0421 # 12 Y:2016 | 12 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,515 | $16,250 | Not Implemented |
LE0421 # 13 Y:2016 | 13 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $3,500 | Implemented |
NC0566 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231,779 | $419,073 | Implemented |
NC0566 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,183 | $44,349 | Implemented |
NC0566 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $5,000 | Implemented |
NC0566 # 04 Y:2016 | 04 | 2016 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $52,211 | $10,000 | Not Implemented |
NC0566 # 05 Y:2016 | 05 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $107,179 | $300,000 | Not Implemented |
NC0566 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,988 | $100 | Implemented |
NC0566 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $788 | $200 | Implemented |
NC0566 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,802 | $12,000 | Not Implemented |
NC0566 # 09 Y:2016 | 09 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $2,230 | $1,000 | Implemented |
NC0566 # 10 Y:2016 | 10 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,287 | $2,000 | Implemented |