IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,279

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0505 # 01 Y:2014 01 2014 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,293 $200 Implemented
NC0505 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,010 $20,000 Not Implemented
NC0505 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $33,641 $67,830 Not Implemented
NC0505 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,186 $100 Implemented
NC0505 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $1,108 $100 Implemented
NC0505 # 06 Y:2014 06 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,874 $200 Implemented
NC0505 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,993 $319 Implemented
NC0505 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,395 $1,909 Not Implemented
NC0505 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,259 $4,256 Implemented
OR0624 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $8,251 $22,500 Not Implemented
OR0624 # 02 Y:2014 02 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,193 $468 Not Implemented
OR0624 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,766 $6,839 Implemented
OR0624 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,361 $30,178 Implemented
DL0116 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $16,300 $10,000 Not Implemented
DL0116 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $5,700 $20 Implemented
DL0116 # 03 Y:2013 03 2013 REDUCE VENTILATION AIR $2,320 $100 Not Implemented
DL0116 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,766 $11,200 Not Implemented
DL0116 # 05 Y:2013 05 2013 REDUCE VENTILATION AIR $11,206 $100 Not Implemented
DL0116 # 06 Y:2013 06 2013 REPAIR AND ELIMINATE STEAM LEAKS $3,323 $4,000 Implemented
DL0116 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $25,430 $24,500 Not Implemented
DL0116 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,226 $12,000 Implemented
DL0116 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,087 $22,969 Not Implemented
DL0116 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,316 $8,800 Not Implemented
DL0116 # 11 Y:2013 11 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,741 $800 Not Implemented
DL0116 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $596 $500 Implemented