IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0171 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $50 Implemented
HO0171 # 05 Y:1998 05 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,531 $3,500 Not Implemented
HO0171 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $383 $190 Not Implemented
HO0171 # 07 Y:1998 07 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $54,070 $24,050 Not Implemented
HO0171 # 08 Y:1998 08 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $64,007 $2,200 Implemented
HO0171 # 09 Y:1998 09 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,116 $1,000 Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
HO0161 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,635 $1,878 Not Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 04 Y:1997 04 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,370 $5,000 Not Implemented
HO0161 # 05 Y:1997 05 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $480 $100 Implemented
HO0161 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,130 $100 Not Implemented
HO0161 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,500 $2,000 Implemented
HO0087 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $970 $1,428 Implemented
HO0087 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $142 $200 Not Implemented
HO0087 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $4,745 $1,700 Not Implemented
HO0087 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,897 $9,097 Implemented
HO0053 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,063 $8,771 Implemented
HO0053 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,598 $6,829 Implemented
HO0053 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,514 $6,400 Implemented
HO0053 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,255 $2,804 Implemented
HO0053 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,072 $1,000 Implemented
HO0053 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $570 $461 Implemented
HO0053 # 07 Y:1993 07 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $168,361 $700,000 Not Implemented
HO0053 # 08 Y:1993 08 1993 OPTIMIZE PLANT POWER FACTOR $8,740 $6,990 Not Implemented