Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0217 # 09 Y:2001 | 09 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $27,457 | $100,000 | Not Implemented |
SU0112 # 01 Y:2001 | 01 | 2001 | EXPAND OPERATIONS INTO UNUSED SPACE | $3,042 | $30 | Not Implemented |
SU0112 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $319 | $0 | Implemented |
SU0112 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,827 | $2,088 | Implemented |
SU0112 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,183 | $90 | Not Implemented |
SU0112 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $421 | $0 | Not Implemented |
SU0112 # 06 Y:2001 | 06 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,560 | $120,000 | Implemented |
SU0112 # 07 Y:2001 | 07 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $223 | $0 | Not Implemented |
MA0487 # 01 Y:2001 | 01 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $496,200 | $950,000 | Not Implemented |
MA0487 # 02 Y:2001 | 02 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $432,600 | $425,000 | Not Implemented |
MA0487 # 03 Y:2001 | 03 | 2001 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $122,200 | $165,000 | Not Implemented |
MA0487 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $155,300 | $44,000 | Not Implemented |
MA0487 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $112,000 | $135,000 | Not Implemented |
MA0487 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,000 | $100,000 | Not Implemented |
MA0487 # 07 Y:2001 | 07 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $61,000 | $23,000 | Not Implemented |
MA0487 # 08 Y:2001 | 08 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $50,300 | $13,000 | Not Implemented |
MA0487 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $850 | Not Implemented |
GT0712 # 01 Y:2001 | 01 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $50,880 | $75,000 | n/a |
GT0712 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,320 | $55,800 | n/a |
GT0712 # 03 Y:2001 | 03 | 2001 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $17,930 | $14,400 | n/a |
GT0712 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $10,878 | $5,050 | n/a |
GT0712 # 05 Y:2001 | 05 | 2001 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $1,166,246 | $1,875,000 | n/a |
GT0712 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $152,112 | $51,570 | n/a |
GT0712 # 07 Y:2001 | 07 | 2001 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $101,860 | $27,240 | n/a |
GT0712 # 08 Y:2001 | 08 | 2001 | HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION | $154,042 | $7,500 | n/a |